AESO 2018 Tariff: Changes affecting Distributed Connected Generators

On September 22, 2019, the Alberta Utilities Commission (the Commission), in Decision 22942-D02-2019, gave its ruling on the 2018 Independent System Operator Tariff application. This decision included approval for the adjusted metering practice proposed by the Alberta Electric System Operator (AESO), as well as changes to the substation fraction allocation method. These two changes are particularly significant to distributed connected generators (DCGs).